ESTIMATE FOR COMPILATION OF SCIENCE LABORATORY AT OLDONYOWAS SECONDARY SCHOOL.

S/N

PARTICULAS

QTY

PRICE @

TOTAL SHS

1.       

BLOCKS 6X9X18

2500

2000/=

5,000,000/=

2.       

SAND

17 LORY

150,000/=

2,550,000/=

3.       

AGGREGATE

6 LORY

400,000/=

2,400,000/=

4.       

STONES

20

110,000/=

2,200,000/=

5.       

CEMENT

350

15,000/=

5,250,000/=

6.       

DPC

I ROLL

120,000/=

120,000/=

7.       

IRON MM 12

70PC

18,000/=

1,610,000/=

8.       

IRON MM 10

20 PC

18,000/=

360,000/=

9.       

IRON MM 8

 30 PC

15,000/=

450,000/=

10.   

IRON MM 6

10 PC

8,000/=

80,000/=

11.   

BINDING WIRE

30 KG

3,500

105,000/=

12.   

IRON SHEETS G. 28 MT3

85 PC

30,000/=

2,550,000/=

13.   

IRON SHEETS G.30 MT3

3

26,000/=

78,000/=

14.   

TIMBER 4’’X2’’

80 PC

16,000/=

1,280,000/=

15.   

TIMBER 3’’X2’’

130 PC

14,000/=

1,820,000/=

16.   

TIMBER 2’’X2’’

12 PC

8,000/=

96,000/=

17.   

TIMBER 6’’X1’’

60PC

15,000/=

900,000/=

18.   

TIMBER  10’X1’’

12 PC

28,000/=

336,000/=

19.   

NAIL MIXTURE                          5 X 4 X 3X 21/2

90 KG

3,000/=

270,000/=

20.   

ROOFING NAIL

25 KG

6,000/=

150,000/=

21.   

SILING BOARD NILS

15 KG

6000/=

90,000/=

22.   

WINDOWS 150 X 150CM

9 PC`

150,000/=

1,350,000/=

23.   

DOOR 100 X 210

4PC

300,000/=

1,200,000/=

24.   

MIRROR SIZE 80X40

63 PC

6,500/=

409,500/=

25.   

MIRROW SIZE 45 X40

15 PC

4,000/=

60,000/=

26.   

WINDOWS HANDLE

22

2,500/=

55,000=

27.   

SILICON

5

2,000/=

10,000/=

28.   

PUT OIL

 80 KG

2,000

160,000/=

29.   

CELLING BOARD

 45 PC

35,000/=

1,575,000/=

30.   

VENTILATION 6X9X19

25 PC

2000/=

50,000/=

31.   

 VENTILATION FOUND

20 PC

2,000/=

40,000/=

32.   

PAINT

304 LT

 

1,200,000/=

33.   

GYPSUM POWDER

 10 PC

20,000/=

200,000/=

34.   

WHITE CEMENT

 12 PC

34,000/=

408,000/=

35.   

SOLVEN

10 LT

5,000/=

50,000/=

36.   

SAND PAPER  NO. 120

18 Ft

500/=

9,000/=

37.   

ROLER BRUSH

5 PC

5,000/=

25,000/=

38.   

BRUSH 5’’, 4’’

10 PC

5,000/=

50,000/=

39.   

FABRE TAPE

3 PC

10,000/=

30,000/=

40.   

PUCHING MASHINE

5 PC

15,000/=

75,000/=

41.   

ELECTICAL INSTILLATION

-

-

1,631,000/=

42.   

LIME

10 PC

13,000/=

130,000/=

43.   

GRAVAL

 4 LORY

80,000/=

320,000/=

 

 MATERIAL COST = 36,732,500/-

LABOUR CHARGES = 10,000,000/-

TOTAL COST = 46,732,500/-

© 2024 Landsby til Landsby